Client:
Vinci Construction
Project:
University Hospital Coventry & Warwickshire (UHCW)
Description of Works:
Theatres 3 & 4 Installation of Hygipod IPS Systems
Works undertaken:
*Installation of the Hygipod IPS System.
*Modify the existing hot and cold-water services and connect onto the new Hygipod IPS appliances.
*Modify the above ground drainage pipework and connect onto the Hygipod IPS appliances.
*Thermally insulate all hot and cold-water services.
*The flushing and water treatment of the hot and cold-water services.